New Caelifera Rises!

March trip.  Lots and lots of progress…for the first time you can really get a feel for how things are fitting together.  Here is the south side…steel siding is being rusted by a combination of vinegar and salt.

image

East wall is more rusted:

image

Inside the view is amazing even through the plastic still on the windows:

image

So glad we have two doors to open up this area onto the big patio they will be pouring:

image

Distance shots

image

image

image

Wall of windows:

image

Test Dog creek wasn’t running, but second seasonal creek was

image

Entry awning/canopy

image

Google auto awesome shows Gusty surveying the land

image

Siding with cedar has begun

image

But lots more to go:

image

Hot cold faucet… Love the metal surround

image

More siding detail:

image

Building is complicated:

image

This is working out to be one of my favorite views.  Its hard to see Mt Garner against the white of the clouds here, but this black metal frames it like a picture and its awe inspiring:

image

New Caelifera Rises!

March trip.  Lots and lots of progress…for the first time you can really get a feel for how things are fitting together.  Here is the south side…steel siding is being rusted by a combination of vinegar and salt.

image

East wall is more rusted:

image

Inside the view is amazing even through the plastic still on the windows:

image

So glad we have two doors to open up this area onto the big patio they will be pouring:

image

Distance shots

image

image

image

Wall of windows:

image

Test Dog creek wasn’t running, but second seasonal creek was

image

Entry awning/canopy

image

Google auto awesome shows Gusty surveying the land

image

Siding with cedar has begun

image

But lots more to go:

image

Hot cold faucet… Love the metal surround

image

More siding detail:

image

Building is complicated:

image

This is working out to be one of my favorite views.  Its hard to see Mt Garner against the white of the clouds here, but this black metal frames it like a picture and its awe inspiring:

image

Framed!

We have framing for the roof:
image

This wall is really tall.  The sliding door that covers it may require an adult to move:
image

Long library.  Left is Max’s bunk:
image

Kitchen area.
image

Steel beam.  More welding needed to secure
image

Windows for the master, bath and bunk room:
image

Very little snow, but lots of frost.
image

Aspens and library window
image

Windows in main room go in next
image

Bunk room
image

Bathroom windows
image

Hole for grill flue
image

Max’s bunk juts out.  This will all be metal and there will be a metal awning out from Max’s bunk box
image

Lots of patio out this direction
image

View from outside shower
image

East Wall

Photos from our builders. Framing of the east wall with framed garage in background:20131202-201227.jpg
Max’s nook is the box jutting out of the main plane of the wall. There will be a steel eve protruding out of that box20131202-201307.jpg
The box at the end is the kitchen. There will be attic space above it with some utilities accessible via a ladder in the pantry.20131202-201327.jpg

Stained and Ready for Framing

Beautiful pictures taken by one of our builders: 20131122-204304.jpg
The concrete has been stained but not sealed. The above picture is a bit darker than it will be due to the base being covered with some ice. Framing is now underway! Here you can see major progress on the garage:
20131122-204329.jpg
My favorite pastime: looking at these pictures and then at the amazing details of then architectural plans and back to the pictures… Amazing to watch schematics turn into reality.

Stained and Ready for Framing

Beautiful pictures taken by one of our builders: 20131122-204304.jpg
The concrete has been stained but not sealed. The above picture is a bit darker than it will be due to the base being covered with some ice. Framing is now underway! Here you can see major progress on the garage:
20131122-204329.jpg
My favorite pastime: looking at these pictures and then at the amazing details of then architectural plans and back to the pictures… Amazing to watch schematics turn into reality.

Slab

A big pour resulted in a beautiful foundation:

Above a sea of clouds
Above a sea of clouds

IMG_5232
Fog like waves

Lots of piping hidden under here. Fun to try to trace what’s what. Good thing the builder labeled them.

Pipes
Pipes

Hope the excavator does not fall off the edge. The fog was on top of the site when we showed up, but rolled out and gave us some beautiful sun. I have a feeling I’m going to be doing some time lapse photography in the near future.

Excavator

Decisions, decisions, decisions. A.k.a. stains.

Stains
Stains

Infinity drain for bath/shower area.

1/0 Drain
1/0 Drain

Footings for the beam that runs the length of the house. Since it’s too late to continue cement work they will place the beams first, make all their adjustments, then fill in afterwards.

Beam footings
Beam footings

Garage now has a foundation.

Garage
Garage

Our builders have a cool old jetstream that they use to store their equipment.

Methow Made
Methow made

On Sunday evening it snowed a bit. Temperatures at the site so far have been a fairly consistent minus 2 from downtown Winthrop.

Snow
Snow

The pour made it easier to get a feel for the height difference between the lower and upper levels. Also the sleeping area off the library, “Max’s room” is really starting to take shape and it’s going to be really cool. The bed at the end of the library will also be an amazing place to sleep. The windows in that room will frame the aspens and have a view back up toward Lewis Butte.

Levels
Levels

Slab

A big pour resulted in a beautiful foundation:

Above a sea of clouds
Above a sea of clouds

IMG_5232
Fog like waves

Lots of piping hidden under here. Fun to try to trace what’s what. Good thing the builder labeled them.

Pipes
Pipes

Hope the excavator does not fall off the edge. The fog was on top of the site when we showed up, but rolled out and gave us some beautiful sun. I have a feeling I’m going to be doing some time lapse photography in the near future.

Excavator

Decisions, decisions, decisions. A.k.a. stains.

Stains
Stains

Infinity drain for bath/shower area.

1/0 Drain
1/0 Drain

Footings for the beam that runs the length of the house. Since it’s too late to continue cement work they will place the beams first, make all their adjustments, then fill in afterwards.

Beam footings
Beam footings

Garage now has a foundation.

Garage
Garage

Our builders have a cool old jetstream that they use to store their equipment.

Methow Made
Methow made

On Sunday evening it snowed a bit. Temperatures at the site so far have been a fairly consistent minus 2 from downtown Winthrop.

Snow
Snow

The pour made it easier to get a feel for the height difference between the lower and upper levels. Also the sleeping area off the library, “Max’s room” is really starting to take shape and it’s going to be really cool. The bed at the end of the library will also be an amazing place to sleep. The windows in that room will frame the aspens and have a view back up toward Lewis Butte.

Levels
Levels